Italian company since 2015 · litio.storeGenuine products · Full manufacturer warrantyReal people, real answers · Quote within 1–2 working days

Dyness · High-voltage battery

Dyness STACK100 51.2kWh (10× S51100 + SBDU100)51.2kWh 512V high-voltage LFP system: 10 S51100 modules, SBDU100 and base

51.2kWh512V

€8,069.41ex. VAT€158/kWhIndicative price · shipping excluded, by pallet
See the shipping cost

Batteries and inverters travel on a pallet with a freight carrier. The cost depends on the country and on the total weight of the order, excluding VAT.

Package weight: 496.5kg

CountryHalf pallet, up to 500kgFull pallet, up to 750kg
Austria€230.00€320.00
Belgium€230.00€320.00
Bulgaria€320.00€410.00
Croatia€320.00€410.00
CyprusOn request
Czechia€230.00€320.00
Denmark€230.00€320.00
Estonia€320.00€410.00
Finland€320.00€410.00
France€230.00€320.00
Germany€230.00€320.00
Greece€320.00€410.00
Hungary€320.00€410.00
Ireland€320.00€410.00
Italy€230.00€320.00
Latvia€320.00€329.24
Lithuania€320.00€410.00
Luxembourg€230.00€320.00
MaltaOn request
Netherlands€230.00€320.00
Poland€230.00€320.00
Portugal€320.00€410.00
Romania€320.00€410.00
Slovakia€320.00€410.00
Slovenia€320.00€410.00
Spain€230.00€320.00
Sweden€320.00€410.00

Above 750kg the pallets add up: 1,000kg, for example, is one pallet plus a half. In the quote we calculate shipping on the weight of the whole order.

91 availableStock updated daily by Litio Store

Buy now on litio.store

Or add the product to your quote: we reply within 1–2 working days. The button opens your cart on litio.store, our online shop.

Configure your system in two minutesPick the inverter and get the batteries it accepts, modules per string, switchboards, price per kWp and the full bill of materials, ready for your quote.Open the configurator →
How to buy

Add the product to your quote and send the request. Within 1–2 working days we'll email you the final price, delivery included.

Sold by Litio Store SRL

An Italian company selling batteries, inverters and solar equipment since 2015. Registered office in Sigillo (Perugia), VAT IT03894170541.

About us
Genuine product, full manufacturer's warranty

New, genuine Dyness products with the full manufacturer's warranty and all their documentation.

Overview

A complete Dyness STACK100 cluster under one code: 10 S51100 modules of 5.12kWh stacked on the base under the SBDU100 control unit. It stores 51.2kWh at 512V nominal (448–584V), 48.64kWh usable at 95% depth of discharge, and charges and discharges at 50A recommended and 100A maximum, i.e. 25.6kW and 51.2kW, with 125A peaks for two minutes. The single column measures 590×390×1563mm and weighs about 492kg. It pairs with high-voltage hybrid inverters on the Dyness list (Solis, GoodWe, Deye, KOSTAL, Solinteg and others) and connects over CAN or RS485; the SBDU100 adds Wi-Fi monitoring in the Dyness app. IP20, indoor installation. The cluster can grow later to fifteen modules (76.8kWh) if the inverter accepts the higher voltage.

  • S51100 modules: 51.2V, 100Ah, 5.12kWh
  • 3 to 15 modules per cluster, 134.4–864V
  • 1C (100A) charge and discharge, 125A peak for 2 minutes
  • Up to 12 clusters in parallel, 921.6kWh
  • Built-in aerosol extinguisher, forced-air cooling
  • ≥8,000 cycles, 10-year warranty

What's in the kit

  • 10 × Dyness S51100
  • 1 × Dyness SBDU100

How it works

STACK100 builds a high-voltage battery from 51.2V, 100Ah lithium iron phosphate modules stacked in series on a base, with the SBDU100 control unit on top. Three to fifteen S51100 modules make one cluster of 15.36kWh to 76.8kWh, operating between 134.4V and 864V. The modules plug into each other without cables, and Dyness quotes about 30 minutes to install one cluster. Each module is 590×390×133mm and weighs 47kg; the SBDU100 adds 133mm and 15.3kg and the base 6.7kg.

Key features

The recommended rate is 0.5C (50A, 2.56kW per module) and the maximum is 1C (100A, 5.12kW per module), with 125A for two minutes at 25°C. Usable energy is 95% of nominal, 4.864kWh per module. Dyness rates at least 8,000 cycles at 0.2C and 25°C to 70% end of life. An aerosol fire extinguisher is built in, the cluster is cooled by fans, and modules of different ages can be mixed within three years. An optional heating function extends charging down to -20°C.

Installation and compatibility

STACK100 is IP20 and must be installed indoors, away from flammable materials. The manual asks for 500mm from other equipment or batteries and 30mm from the wall; when running at 0.5C or more in a room without temperature control, keep more than 300mm between the fan side and another cluster. More than twelve modules should be split into two columns. Up to 12 clusters can be paralleled when their voltages are within 20V, all are fully charged and the newest is less than three years younger.

The datasheet lists compatible inverters from KOSTAL, Ingeteam, Solis, GoodWe, Solplanet, SAJ, Deye, Hoymiles and Solinteg, among others. For parallel clusters only the cable labelled CAN may be used. Clusters connect to the inverter over CAN or RS485; the battery is supplied with one cable labelled RS485 for KOSTAL inverters and one labelled CAN for the other listed brands.

Monitoring and certification

The SBDU100 has a built-in Wi-Fi module for the Dyness app, including over-the-air updates. The datasheet lists CE-EMC, CE-RED, IEC 62619, IEC 63056, IEC 62477, IEC 62040, UN38.3, VDE 2510, CEI 0-21 and CEI 0-16, and the EU declaration of conformity covers the heated S51100 and SBDU100 versions. Noise is up to 55dB.

Questions and answers

How many S51100 modules can one STACK100 cluster hold?

Between 3 and 15 modules, i.e. 15.36kWh to 76.8kWh. Above twelve modules Dyness recommends installing them in two columns.

Can STACK100 be installed outdoors?

No. STACK100 is IP20 and the manual requires indoor installation. For outdoor locations Dyness offers the IP66 STACK100 Pro.

What is the maximum system size?

Up to 12 clusters of up to 15 modules in parallel, 921.6kWh in total. Clusters must be within 20V of each other and fully charged when connected.

What else is needed besides the modules?

Each cluster needs one SBDU100 control unit and a base. The inverter must be a high-voltage hybrid model approved by Dyness for the cluster voltage.

Other models in this series

High-voltage batteryDyness STACK100 S51100 battery module – High-voltage battery – photo 1

Dyness

S51100

5.12kWh51.2V

from€732.94ex. VAT€143/kWhIndicative price · shipping excluded, by pallet

125 available

High-voltage batteryDyness STACK100 30.72kWh (6× S51100 + SBDU100) – High-voltage battery – photo 1

Dyness

Dyness STACK100 30.72kWh (6× S51100 + SBDU100)

30.72kWh307.2V

from€5,137.65ex. VAT€167/kWhIndicative price · shipping excluded, by pallet

152 available

High-voltage batteryDyness STACK100 40.96kWh (8× S51100 + SBDU100) – High-voltage battery – photo 1

Dyness

Dyness STACK100 40.96kWh (8× S51100 + SBDU100)

40.96kWh409.6V

from€6,603.53ex. VAT€161/kWhIndicative price · shipping excluded, by pallet

114 available

High-voltage batteryDyness STACK100 66.56kWh (13× S51100 + SBDU100) – High-voltage battery – photo 1

Dyness

Dyness STACK100 66.56kWh (13× S51100 + SBDU100)

66.56kWh665.6V

from€10,568.39ex. VAT€159/kWhIndicative price · shipping excluded, by pallet

7 available

You may also like

High-voltage batterySolisStorage FlexHome-H 40kWh system (8× BAT5kWh-H, CB50A-H) – High-voltage battery – photo 1

Solis

SolisStorage FlexHome-H 40kWh system (8× BAT5kWh-H, CB50A-H)

40kWh409.6V

from€8,120.71ex. VAT€203/kWhIndicative price · shipping excluded, by pallet

32 available

High-voltage batteryPylontech Force H3 35.84kWh tower (7× FH10050, FC1000) – High-voltage battery – photo 1

Pylontech

Pylontech Force H3 35.84kWh tower (7× FH10050, FC1000)

35.84kWh716.8V

from€6,865.12ex. VAT€192/kWhIndicative price · shipping excluded, by pallet

127 available

High-voltage batterySolisStorage FlexHome-H 35kWh system (7× BAT5kWh-H, CB50A-H) – High-voltage battery – photo 1

Solis

SolisStorage FlexHome-H 35kWh system (7× BAT5kWh-H, CB50A-H)

35kWh358.4V

from€7,172.27ex. VAT€205/kWhIndicative price · shipping excluded, by pallet

37 available

High-voltage batteryPylontech Force H3 30.72kWh tower (6× FH10050, FC1000) – High-voltage battery – photo 1

Pylontech

Pylontech Force H3 30.72kWh tower (6× FH10050, FC1000)

30.72kWh614.4V

from€5,956.40ex. VAT€194/kWhIndicative price · shipping excluded, by pallet

149 available

  • Italian company since 2015Litio Store SRL, Sigillo (Perugia)
  • Genuine productsFull manufacturer warranty
  • Datasheets and manualsFor every product, ready to download
  • Real people, real answersQuote within 1–2 working days

PV Radar

Email updates for installers and people planning a PV or storage system. Pick your topics: no spam, unsubscribe in one click.

What would you like to receive?